Home

Project Overview

Contact Us

Public Meetings

At Your Service.

Rapid City Utility System Master Plan

Water Distribution System Pressure Testing

Pressure Monitoring of Water Distribution System

 

In July of 2006, pressure monitoring devices were installed at various locations throughout the water distribution system to measure line pressure under high demand.  This information was evaluated with corresponding flowrates, and later used to calibrate the hydraulic models of the water system.

FAQ

Project Status

 

Field Data Collection

Pressure gage on the

‘flow’ hydrant